Campus NewsCOVID-19 BREAKING: Positive COVID-19 result in ILLC wastewater testing February 16, 2022 A positive wastewater testing result indicates that an individual who used the building’s washroom facilities has COVID-19
Campus News UPDATE: Two reports of bed bug sightings in Rye library this month February 20, 2020 This is the second report of bed bugs in the Ryerson Library since November 2019
Campus News Mould still leaving students groups without space October 1, 2019 The mould abatement started in December 2018—nine months later, groups still do not have access to their offices in the SCC
Campus News What is Ryerson planning for upcoming campus expansions? March 13, 2019 “We’ve heard a lot of concerns around the lack of space," said the director of real estate for FMD
Campus News Ryerson won’t restock sanitary dispensers on campus January 16, 2019 Sanitary napkin dispensers across campus are empty, and Ryerson University has no plans to restart the program that restocked them
Campus News Orkin Canada treating cockroaches in Ryerson’s SCC building November 28, 2018 After several cockroach sightings in the SCC, management said they are monitoring the situation
Campus News Kerr Hall power to be shut off over winter break November 20, 2018 General electricity—including computers, equipment, and non-emergency lighting—won't be accessible or functional during that time
Campus News Aerospace student area to be converted into a storage space November 13, 2018 A room in the Engineering building will undergo construction in February to create a storage space for the civil engineering department, leaving students and faculty in search of a safe workspace
Campus News Gould Street and buildings nearby closed for emergency flood repairs September 5, 2017 On the first day of classes in the fall semester, a water main broke on Gould Street, flooding the street and prompting the shutoff of water in surrounding buildings. Welcome back!